2026-10-25

The LXRP work is progressing. New stanchions for the overhead wires being installed. The existing brown ones, probably in place since the railway was first electrified, are getting rarer by the day.

Workers in orange safety vests are conducting maintenance on a railway track at a train station during overcast weather.